Whohoo, I'm 50% finished with the Persian Star Shawl! It's an awesome feeling.
I didn't think, this past January, that PSS would take so long. I figured, yeah, I took the better part of a year on Galveston, but really, I slacked on it so much, surely I can knock out a completed shawl in four months or so.
Hahahahahaha. Hahahahahahaaha. Hahahahahahahaha.
*Wipes away tear* Yeah, that's a good one.
So I started this in January, January 20th to be exact, and that was almost 7 months ago. I'm not sure if that date was when I cast on the first stitches, or when I started sketching it out, but that's the date I put into Ravelry. So far, the PSS has been with me on the Rav February Meet-Up in Austin, has been with me while we planned our trip to Iran, and when that trip was canceled. It has been with me while Mr. Ex and I went our separate ways, and has been with me as I build my new life. The shawl has seen many changes, both in its design and in my life while I designed it.
May the next 50% be entirely less eventful.
Wednesday, July 08, 2009
Subscribe to:
Post Comments (Atom)
1 comment:
a great find for panda fanatic!
my roommate and i LOVE this bag
hkpanda.freetzi.com
Post a Comment